Public utility

Nuclear Power Plant

Ultra-high electricity output with education and water requirements.

Building image coming soon This guide has a reserved image area. Screenshots or renders can be added here later without changing the page layout.

Quick facts

Best for Late-game bulk electricity
Placement priority Large reserved utility site
Watch for Water use, education requirement, and land value impact
Build cost 30,000
Upkeep 300/hr
Footprint 10x5
Effect 3,000 kW, radius 20

Role in the city

The nuclear plant is a late-game power anchor. It delivers massive output but asks for water, education, and careful separation from housing.

Placement advice

Reserve a wide utility block with road and water access. Do not squeeze it into the center of a happiness or residential cluster.

When to build or upgrade

Use it when several districts need a single stable power backbone and the university requirement is already under control.

Related building guides

Buildings work together. Compare nearby utilities and services before deciding what to fund next.